MacEwan Robbins Health Learning Centre

Project Overview

What better way to complete such an important expansion of MacEwan University’s infrastructure than through design-build construction methodology? We were privileged to work together with Clark Builders and Stantec to create this dynamic teaching facility for the medical arts. One of the first buildings in Edmonton to incorporate waterless urinal technology for conservation. The project also included state-of-the-art health learning systems (similar to a working hospital), along with LEED-driven air systems with heat recovery and a rainwater harvesting system.

Details

Sector: Institutional
Location: Edmonton, AB.
Size: 165,000 SQ FT
Completion Date: August 2008